Retaining Wall Block Calculator
Count blocks, buried courses and separate caps for a straight level wall.
Turn the block count into a complete material order
The block subtotal below excludes aggregate and other components. Before asking for delivery, split the order into installed blocks, caps, base aggregate, block-core fill, wall-back aggregate and the other items shown on your design. Use the exact block system and approved layout for each quantity.
The Allan Block material worksheet treats base aggregate and the core/consolidation zone separately and refers reinforcement and drainage details to the plans. Its system-specific dimensions and material specifications are not defaults for every retaining wall.
Three aggregate quantities to keep distinct
- Base
- Multiply its designed length × width × thickness. Use feet throughout and divide cubic feet by 27 for cubic yards. Do not use wall-face area as base volume.
- Behind the wall
- Use the actual aggregate-zone cross-section and height. If calculating a separate rear rectangle, begin at the back of the block so it does not include the block body or cores again. Split changes in height or depth into separate sections.
- Inside the blocks
- Use the manufacturer's fill volume per installed hollow unit, or its documented combined core-and-rear-zone estimate. Do not estimate hollow space from the external block dimensions. If a supplied figure already includes cores and rear aggregate, do not add core fill a second time.
An original, checkable order example
Assume a plan supplies these hypothetical quantities: a 20 ft base, 2 ft wide and 0.5 ft thick; a separate rear aggregate zone 20 ft long, 1 ft thick and 2.5 ft high; and 75 installed hollow blocks needing 0.20 cu ft each. These values demonstrate an order, not a wall design or a real block's core capacity.
- Base: 20 × 2 × 0.5 = 20 cu ft.
- Rear zone, excluding block bodies: 20 × 1 × 2.5 = 50 cu ft.
- Cores: 75 × 0.20 = 15 cu ft.
- If all three use the same approved aggregate and volume basis: 85 cu ft ÷ 27 = 3.148148 cu yd. A separately chosen 5% handling allowance gives 3.305556 cu yd.
At a hypothetical supplier increment of 0.5 cu yd, the actual bulk purchase is 3.5 cu yd. At 0.5 cu ft per bag, the alternative is 179 bags. These alternatives must use the same material and a valid delivery-volume conversion; the example assumes factor 1. Spare blocks bought for breakage are not installed units to fill. For example, ordering 83 blocks does not change the planned 75 cores to 83.
Carry the quantities into the purchase planner
Open the multi-area aggregate purchase worksheet. Its arithmetic can be used for your specified wall aggregate; this does not mean you should buy paving-base material. Enter three rows: Base 20 × 2 ft at 6 in; Rear zone 20 × 1 ft at 30 in; and Core-volume equivalent 15 × 1 ft at 12 in. The last row is an explicitly labeled 15 cu ft equivalent, not a real trench. Use zero exclusions, 5% extra, factor 1, bag yield 0.5 and bulk increment 0.5. Replace every assumption with your confirmed specification before ordering.
If the materials differ, run separate worksheets. If the manufacturer supplies a combined core-and-rear estimate, use it once instead of those two rows. Ask whether that figure already contains a delivery adjustment or reserve before adding either again.
Complete the quote before comparing totals
Attach the downloadable wall-order brief to the block estimate and aggregate export. It records caps, adhesive, drain pipe, specified reinforcement, delivery and missing prices separately. An unpriced item is unresolved, not free. Do not use this quantity workflow to choose reinforcement, drainage outlets, foundation dimensions or wall height.
Wall purchase workflow reviewed November 4, 2026. Hypothetical example; no construction or engineering approval implied.
Material-choice review: November 2, 2026. These are planning choices, not a site inspection or a drainage specification.
- Blocks per course
- 15 blocks
- Courses including buried rows
- 5 courses
- Cap blocks (separate)
- 17 caps
- Material subtotal (entered price only)
- Not supplied
Whole packages round up. Prices include only the items you enter. Delivery, tax and installation may be extra.
How to calculate
Blocks are rounded up per course and courses are rounded up by height. Caps are counted separately and excluded from regular block height. Returns, corners and curves are not included.
Worked example
Length (ft): 20 · Exposed block height (ft; excludes caps): 2 · Block face length (in): 16 · Block course height (in): 6 · Additional buried courses: 1 · Cap length (in): 16 · Extra material (%): 10.
These inputs produce 83 wall blocks. Change the measurements above to match your project.
Measure the right surfaces
Measure the straight wall length and exposed block height excluding caps. Use actual block face length and course height, then add the number of buried courses required by the selected design. Count caps separately because their dimensions may differ from regular blocks.
A second example you can check
A 20 ft straight wall with 2 ft exposed height, 16 in long by 6 in high blocks and one buried course uses ceil(240 ÷ 16) = 15 blocks per course and ceil(24 ÷ 6) + 1 = 5 courses. That is 75 blocks before extra material, or 83 at 10%. With 16 in caps, the separate cap order is 17.
Where estimates go wrong
Corners, curves, setbacks and stepped foundations cannot be represented accurately by one straight level rectangle. Rounding course height upward can increase the wall height beyond the intended layout. The material count does not determine reinforcement or whether a permit is required.
Build your supplier order
Use the manufacturer’s system details and an approved layout. List base, drainage aggregate, drainage pipe, geogrid where specified, caps and adhesive separately. Entered block price covers regular blocks only, so a material subtotal is not a complete wall budget.
Retaining Wall Block: practical questions
Are buried blocks included?
Yes, through the Additional buried courses input. They are added to the rounded-up exposed courses.
Does cap height contribute to exposed height?
Not in this model. Enter the exposed height of regular blocks only and account for cap height in your finished elevation plan.
Inputs and references
Allan Block: material estimation worksheet — Manufacturer estimation separates blocks and caps and includes buried wall height. Product dimensions and approved drawings control.
YardTakeoff · Revised October 11, 2026 · Formula checks and scope · Report a calculation error
Plan the whole order
Use the quote checklist to record materials outside this calculator’s scope.