YARDTAKEOFF WALL ORDER BRIEF — 2026-11-04 Attach the block estimate, aggregate worksheets and the selected system's plan. This record does not design a wall. Project / supplier / quote date / validity: Block system and plan revision: Installed block count (including buried courses): Spare / breakage blocks purchased separately: Caps: product / quantity / price: Adhesive: specified product / label yield / quantity / price: AGGREGATE: one record per material Exact product and approved use: Base geometry and volume: Rear-zone geometry and volume, excluding block bodies: Manufacturer core fill per INSTALLED unit and unit count: OR manufacturer combined core-and-rear estimate (do not add cores again): Measured volume / loose-delivery conversion and source: Allowance already included? / additional allowance and reason: Supplier minimum / increment / actual bulk order: Bag yield / rounded bag alternative: Product subtotal / delivery / tax / unloading: OTHER DESIGN ITEMS (mark not required only when confirmed) Drain pipe, fittings and outlets: Geogrid or other specified reinforcement, dimensions and quantity: Specified filtration/separation materials: Excavation / disposal / labor / access: Unpriced items and answers required before purchase: Check: all combined quantities refer to the same approved material and volume basis. Check: core fill is not counted twice, and spare blocks are not treated as installed cores. Tool: https://getyardtakeoff.com/retaining-wall-block-calculator/ Reference: https://new.allanblock.com/installation/commercial-installation/material-estimation-worksheet