Pea Gravel Calculator

Calculate pea gravel yardage and bag count for paths and beds.

01 / Your project

Measure. Adjust. Calculate.

Example values are editable, not installation specifications. A $0 price means costs have not been entered.

Your material takeoff
1.3
cubic yards to order
Measured area
192 sq ft
Before allowance
1.19 cu yd
Bag alternative
71 bags
Material subtotal (entered price only)
0 USD

Whole packages round up. Prices include only the items you enter. Delivery, tax and installation may be extra.

How to calculate

Use the average layer depth over the measured footprint. Bags are an alternative purchase method to bulk yardage, not an additional order.

Cubic yards = length × width × depth ÷ 324 × (1 + allowance / 100)

Worked example

Length (ft): 16 · Width (ft): 12 · Material depth (in): 2 · Bag yield (cu ft): 0.5 · Extra material (%): 10.

These inputs produce 1.3 cubic yards to order. Change the measurements above to match your project.

Before you order

Check bag volume rather than assuming all bags with the same weight have the same yield. Account for existing material you plan to keep.

For an irregular footprint, split the project into rectangles. Calculate each section and combine unrounded quantities before rounding the final order. Ask the supplier to confirm product yield and available package sizes.

Common questions

Is the allowance an installation recommendation?

No. It is an editable purchasing buffer. Cuts, spills and product requirements vary. Confirm the allowance for your layout.

Does this include installation costs?

Only prices you explicitly enter are included. A material-only result is not an installed quote. Request an itemized quote for site preparation, access, removal, drainage, labor, delivery and tax.

Method maintained by YardTakeoff · Updated September 23, 2026. Assumptions and limitations.

Explore more calculators