Paver Edging Calculator

Count edge restraint pieces from the exposed patio perimeter.

01 / Your project

Your measurements and product

Example values are editable, not installation specifications. A $0 price means costs have not been entered.

Example estimate — edit inputs to calculate yours
11
edging pieces
Exposed perimeter
56 ft
Purchased length
66 ft
Material subtotal (entered price only)
Not supplied

Whole packages round up. Prices include only the items you enter. Delivery, tax and installation may be extra.

How to calculate

Start with a rectangular perimeter, then subtract edges that your installation plan does not require you to restrain. The result assumes cut pieces can be reused.

Pieces = round up((2 × (length + width) − excluded edge) × allowance factor ÷ piece length)

Worked example

Length (ft): 16 · Width (ft): 12 · Unrestrained perimeter to exclude (ft): 0 · Length per piece (ft): 6 · Extra material (%): 10.

These inputs produce 11 edging pieces. Change the measurements above to match your project.

Measure the right surfaces

Measure each edge that actually requires restraint. For a rectangle, begin with twice the length plus twice the width and subtract only the sections excluded by the installation plan. A building wall is not automatically an acceptable substitute for restraint; confirm the detail.

A second example you can check

A 12 × 10 ft patio has 44 ft of perimeter. Excluding an approved 10 ft edge leaves 34 ft. With 5% extra, 35.7 ft is needed; 6 ft pieces produce an area-independent minimum of 6 pieces, or 36 ft purchased.

Where estimates go wrong

The formula pools usable lengths. Two separate 7 ft runs need 14 ft in total, but their cut plan may not use three 6 ft pieces efficiently. Curves, corners and connection requirements can also prevent a leftover from serving another run.

Build your supplier order

Write down each uninterrupted run before buying. Confirm straight or flexible pieces, connectors, corner details and the fastener schedule for the substrate. Stakes are not included in the displayed piece count.

Paver Edging: practical questions

Are spikes included?

No. Fastener spacing is product- and substrate-specific. Build that count from the manufacturer’s fastening schedule.

What does excluding all edges do?

The result is zero edging pieces. That is arithmetic only and does not validate an unrestrained installation.

Inputs and references

CMHA: interlocking concrete pavement construction — Use the installation system specification to distinguish base, bedding and jointing materials.

YardTakeoff · Revised October 11, 2026 · Formula checks and scope · Report a calculation error

Plan the whole order

Related quantity tools